quadra-de-tenis-em-manutencaoThe Powder Max gives some tips on daily maintenance of clay courts.

Night time:
At the end of the activities, at night, the official service must pass the network or scrubbing brush, sweeping lines and drench the court. The amount of water should be enough for the court dawns on playing conditions for the morning. The employee must comply with various weather, or the climate of the day, shadow points on the court, etc. In case you play more or less water depending on the situation.

Period Morning - from 6: 00hs to 12: 00hs:
At the beginning of tenísticas activities in the morning, the official service must pass the network or scrubbing brush, sweeping lines and release the court for tennis players.

Period Afternoon - 12: 00hs to 16: 30h:
During this period, the court should have new maintenance. The employee must pass the network or scrubbing brush, sweeping lines and then wet again with more or less water depending on the need.

Period Afternoon / Evening - 16: 30h to 22: 00hs:
During this period there should be a slight drizzled to support the period stated above.

Comments:

These procedures should be followed every day. Monday, where usually the clubs and gyms are closed, the courts should be repaired in tile dust, small holes that might appear, network time of the conference, in short, all the necessary requirements.

The life of the clay court is water, so it should be watered every day. The ideal conditions to play is when the block is red.

When the block is new to apply the roller 350 kg all week. After rains not release before moving the roller.
The tile powder should always be replaced at times of great winds or heavy rains approximately five bags of each side.

2 Responses

  1. Bom dia.

    Gostaria de saber se quando faço a reposição do pó de telha na quadra, tenho que passar o rolo ou somente o escovão para espalhar e depois molhar?